PRODUCTGODS
Menu
Develop the product9 min read

Quality control inspection: factory audits, the three inspections and AQL

What an independent inspector checks at each stage of an order, how AQL sampling decides pass or fail, what the report should show and what to do when a shipment fails.

Contents
  1. 01Why inspect at the factory
  2. 02Factory audits: before you place the order
  3. 03The three inspections during an order
  4. 04AQL: how the sample decides pass or fail
  5. 05The golden sample is the standard
  6. 06How to book a third-party inspector
  7. 07What an inspection report shows
  8. 08What to do when a shipment fails
  9. QQuestions

A quality control inspection is a check of your goods against a written standard (your spec, your approved sample and your order) by someone who isn't the factory, before you pay the balance or the goods ship. For an overseas order there are four checks worth knowing: a factory audit before you order, then pre-production, during-production and pre-shipment inspections. SGS calls the pre-shipment (final random) inspection the most common type.

Most inspectors don't check every unit. They pull a random sample and judge the lot with an AQL sampling plan from ISO 2859-1 or ANSI/ASQ Z1.4. This guide covers each check, how AQL works without the tables, how to book an inspector, what a report shows and what to do if the goods fail.

01Why inspect at the factory

Once goods are on a ship and the balance is paid, your leverage is mostly gone. Defects found at your warehouse cost you freight both ways, a delayed launch and a negotiation from a distance. Defects found at the factory can be sorted, reworked or replaced before anything leaves.

An inspection is only as good as the standard it checks against. "Check the quality" gives an inspector nothing to measure. A spec with measurements and tolerances, a sealed approved sample and a purchase order that states the inspection standard give them a pass or fail line. As the course puts it: they said it on WeChat is not a quality system.

Our tech pack guide covers the written spec.

02Factory audits: before you place the order

A factory audit looks at the supplier, not your goods. It answers "can this factory make my product reliably, and how does it run?" before you commit. The common types:

Audit typeWhat it looks atWhen it is worth it
Manufacturing or quality auditEquipment, capacity, the factory's own QC steps, incoming material checks, how defects are recordedA first order with a new supplier, a technical product, a large deposit
Social compliance auditLabor, wages and hours, health and safety, sometimes environment and business ethicsA retailer requires it, or you need to show how the goods were made
Desk or video checkBusiness license, export history, a live video walk of the floorEvery new supplier, before samples

Social audits usually follow a named methodology. Sedex's SMETA, for example, assesses a site against local law and the ETI Base Code, which is founded on ILO conventions. If a retailer asks for an audit, ask which methodology it accepts before you book one.

For a small first order, a video walk-through and a check of who you're really dealing with (factory or trading company) is often enough. Our guide to finding a manufacturer covers how to verify a supplier from public records.

03The three inspections during an order

InspectionWhenWhat it catches
Pre-production inspectionBefore or at the start of production, once materials and components are inWrong fabric, color, weight or trims before they are cut and sewn; a first piece that doesn't match the approved sample
During-production inspection (DUPRO)Early in the run, once a share of units is finishedRepeating workmanship problems while most of the order can still be fixed
Pre-shipment inspection (final random inspection)When production is finished and most of the order is packedThe finished goods, counted, measured, tested and checked against the sample, plus packaging and cartons

Inspection firms set the pre-shipment timing in their own terms. SGS describes its final random inspection as happening once the batch is fully made and at least 80% of the products are packed; QIMA inspects when production is at least 80% complete. SGS also offers loading supervision, where the inspector watches the cartons go into the container and seals it.

You don't need all three on every order. A rough rule: book a pre-shipment inspection on any meaningful international order; add a pre-production check when a material is custom or hard to replace (a dyed fabric, a molded part); add a during-production check on a large or first run, where a repeated defect would be expensive.

04AQL: how the sample decides pass or fail

AQL stands for acceptance quality limit (you will also see "acceptable quality level"). It is the worst defect rate you are willing to accept on average, set per defect class. An AQL sampling plan turns that into two numbers for a given lot: how many units to pull at random, and how many defects in that sample are allowed before the lot fails.

The plans come from two standards:

  • ISO 2859-1, Sampling procedures for inspection by attributes, Part 1: sampling schemes indexed by AQL for lot-by-lot inspection. The third edition, ISO 2859-1:2026, was published in January 2026 and replaced the 1999 edition and its amendments. It adds skip-lot procedures.
  • ANSI/ASQ Z1.4, Sampling Procedures and Tables for Inspection by Attributes, the American national standard. ASQ describes it as a direct descendant of the US military's MIL-STD-105E, which the Department of Defense stopped supporting in 1995, recommending Z1.4 as its replacement.

Both are sold by their publishers; inspection firms use them and will tell you which one, and which edition, their report follows. How a plan works, in outline:

  1. Lot size and inspection level give a sample size. A bigger lot means a bigger sample, but not in proportion. The inspection level sets how hard to look; ask which level the inspector proposes.
  2. The AQL per defect class gives the accept and reject numbers for that sample size.
  3. Defects are sorted into classes: critical (unsafe or non-compliant), major (a functional defect or a large visible flaw) and minor (cosmetic, doesn't affect function). QIMA, for one, treats a critical defect as an immediate fail.
  4. The inspector counts defects per class. If any class goes over its accept number, the lot fails that class.

05The golden sample is the standard

The golden sample (also called the approval or sealed sample) is the unit you approved for production, signed or sealed so nobody can swap it. It is what the inspector compares color, hand, measurements, labels and finish against.

  • Keep one with the factory and one with you, both sealed and labeled with the date and the revision.
  • Give the inspector photos and measurements of it along with your spec, so they can check without calling you.
  • Keep it out of circulation, so the reference stays untouched.

Measurements need tolerances to be checkable. "Chest about 54 cm" can't fail; "chest 54 cm, plus or minus 1 cm" can.

06How to book a third-party inspector

QIMA, V-Trust and SGS are examples of firms that offer third-party inspections; naming them is not a recommendation, and smaller local firms and independent inspectors do the same work. Get a quote from more than one, and check they cover your product type in your factory's city.

What to have ready when you book:

  • The factory's name, address and contact, and the expected inspection date
  • Your purchase order: quantities by style, color and size
  • The spec or tech pack with tolerances, and photos of the golden sample
  • The AQL per defect class, and any tests you want (a wash test, a seam pull, a zipper cycle, a drop test for fragile goods)
  • The packaging, labeling and carton marking requirements
  • The known weak points: the defect you already saw in sampling

Tell the factory the inspection is a condition of the balance payment, and confirm the date with them so the goods are actually ready. Ask the inspection firm what it charges if the inspector arrives and the goods aren't.

07What an inspection report shows

Check that a pre-shipment report has:

  • An overall result (pass, fail or pending your decision) and the standard and AQL used
  • Quantity: units finished and packed against the order, and cartons counted
  • Packaging: inner packs, carton marks, carton dimensions and weights
  • Conformity: color, materials, construction, dimensions, artwork and labels against the golden sample and spec
  • Measurements: the units measured and any out of tolerance
  • Function and on-site tests, with results
  • Defects found, by class (critical, major, minor), against the allowed numbers
  • Photos of every defect and of the cartons, with the inspector's notes

QIMA, for one, issues its report the same day as the inspection, with a pass or fail result, a findings summary and photos. Read it before you release the balance, and ask questions while the inspector's notes are fresh.

08What to do when a shipment fails

A fail is a decision point, not an emergency, if you agreed the remedies on the purchase order before production. The usual options:

ResultTypical response
Critical defect foundStop. Don't ship. The factory finds the cause and sorts or remakes. Re-inspect.
Major defects over the limitThe factory sorts 100% and reworks or replaces the bad units, then you re-inspect.
Minor defects over the limitRework, accept with a discount, or accept as is, depending on what your customers will notice.
Short quantity or wrong packingFix before shipping, or adjust the invoice.

The Product Sourcing Secrets course covers how to write those remedies into the order before production, including who pays for a re-inspection after rework.

Two rules hold in every case: don't pay the balance until the goods pass or you have agreed the remedy in writing, and keep the report. It is your evidence if the problem shows up again on the next order.

QQuestions

Q01What is a quality control inspection?

It is a check of products against a written standard (your spec, approved sample and order terms) by someone independent of the factory. For imported goods it is usually done at the factory before the balance is paid or the goods ship.

Q02What are the types of quality inspection?

For an order from a factory: a factory audit before you order, a pre-production inspection of materials and first pieces, a during-production inspection early in the run, and a pre-shipment inspection of the finished, packed goods. Some firms also offer a container loading check.

Q03What is a factory audit?

An assessment of the supplier rather than your goods: its equipment, capacity and quality system (a manufacturing audit) or its labor, health and safety practices (a social compliance audit, such as Sedex SMETA). It is done before you place an order, or when a retailer asks for it.

Q04What does AQL mean in an inspection?

Acceptance quality limit. It sets how many defects of each class are allowed in a random sample before the lot fails, using the sampling plans in ISO 2859-1 or ANSI/ASQ Z1.4. It is a statistical plan, not a guarantee that every unit is good.

Q05When should a pre-shipment inspection happen?

When production is finished and most of the order is packed, so the inspector can pull a random sample from the cartons. Inspection firms such as SGS and QIMA describe this as at least 80% packed.

Q06Who pays for a quality inspection?

Usually the buyer books and pays for a third-party inspection, so the inspector works for you. Who pays for a re-inspection after a failed one is worth agreeing with the factory in writing before production.

→Where to go next

SSources

Product Sourcing Secrets$899 one-time

Get the full system

Product Sourcing Secrets walks one product from idea to an approved production order: the brief, the RFQ, sampling, landed cost, the PO and inspection. It comes with The Vault, our researched list of 300+ factories with contact notes, and a database of 100+ tech pack designers.

Lock in $899All sales are final.